Website Disclaimer

Funding for the Reproductive Health National Training Center ended on March 31, 2026. Training Tracking System features are expected to be available through June 14, 2026 and resources are expected to be available through December 15, 2026, though availability cannot be guaranteed and content will not be updated. For more information about steps training administrators and account holders should take, refer to this FAQ.

This expectation instructs TPP23 Hub grantees to:

  • Develop and define Hub-specific performance measures.
  • Collect, analyze, and report on all OPA and Hub-specific performance measures.
  • Monitor the project to assess progress. 
  • Determine the need for and obtain Institutional Review Board (IRB) approval or exemption.